- Date: 06/02/2019
- Source: Deccan Herald
KIA to be 100% green by 2020-end
In the second phase, besides the 3.35 MW installation by Sunshot, BLAL purchased 20 MUs of solar power through open access from Bosch plant with a capacity of 14.4 MW. This plant was commissioned in Belagavi. BIAL also purchased 20 MUs of solar power through open access from CleanMax.