- Date: 09/04/2019
- Source: Smart Investor
Solar installation stood at 8.3 GW in 2018, Adani top project developer
India’s solar panel installation stood at 8.3 gw in 2018. The installations include large-scale and rooftop solar capacity. The country’s cumulative solar capacity is around 28 gw as of 2018.