Solar Power Plants in Maharashtra

Our journey as the most trusted sustainability partner for corporates in Maharashtra started in 2014. Since then, we have installed 150 solar power plants in the state, with a total solar capacity of over 67 MWp generating over 10,03,96,476 units of solar electricity annually. This has helped us abate over 96,381 tonnes of CO2 and provide green energy to clients across diverse sectors, including Auto, Auto ancillaries, Education, Government, Engineering/Capital Goods(Manufacturing), Chemical, Consumer Durables, Retail, Healthcare/Pharma, IT, Malls and Building Materials.

View Our Projects

Project size: 576 kWp
Roof type: Metal Rooftop
Module type: MONO Crystalline
Inverter type: String
Industry type: Auto & Auto ancillaries
Commissioned on: 2019
CO2 Abated: 829 Tonnes
Trees saved: 13,714
View Photos

576 kWp, Metal Rooftop Installation

Battery Manufacturer ,   Rajangaon

Project size: 195 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Education
Commissioned on: 2018
CO2 Abated: 281 Tonnes
Trees saved: 4,643
View Photos

195 kWp, RCC Rooftop Installation

Dr. Panjabrao Krishi Vidyapith ,   Akola

Project size: 250 kWp
Roof type: Ground Mount
Module type: POLY PERC
Inverter type: String
Industry type: Infrastructure
Commissioned on: 2018
CO2 Abated: 360 Tonnes
Trees saved: 5,953
View Photos

250 kWp, Ground Mount Installation

For a Engineering company ,   Karad

Project size: 601 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Manufacturing
Commissioned on: 2017
CO2 Abated: 865 Tonnes
Trees saved: 14,310
View Photos

601 kWp, Metal Rooftop Installation

Knorr Bremse ,   Hinjewadi

Project size: 915 kWp
Roof type: RCC + Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Manufacturing
Commissioned on: 2017
CO2 Abated: 1,318 Tonnes
Trees saved: 21,787
View Photos

915 kWp, RCC + Metal Rooftop Installation

Power and Industrial equipments Manufacturer ,   Nashik

Project size: 384 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Food & Beverage
Commissioned on: 2017
CO2 Abated: 553 Tonnes
Trees saved: 9,143
View Photos

384 kWp, Metal Rooftop Installation

United Breweries Ltd ,   Taloja

Project size: 704 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Food & Beverage
Commissioned on: 2017
CO2 Abated: 1,014 Tonnes
Trees saved: 16,763
View Photos

704 kWp, Metal Rooftop Installation

United Breweries Ltd ,   Aurangabad

Project size: 302 kWp
Roof type: RCC + Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Auto & Auto ancillaries
Commissioned on: 2017
CO2 Abated: 435 Tonnes
Trees saved: 7,191
View Photos

302 kWp, RCC + Metal Rooftop Installation

Automotive Component Manufacturer ,   Pune

Project size: 71 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Government
Commissioned on: 2017
CO2 Abated: 101 Tonnes
Trees saved: 1,676
View Photos

71 kWp, RCC Rooftop Installtion

MOES - National Research Centre for Grapes ,   Pune

Project size: 1,650 kWp
Roof type: RCC + Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Real Estate
Commissioned on: 2017
CO2 Abated: 2,376 Tonnes
Trees saved: 39,288
View Photos

1,650 kWp, RCC + Metal Rooftop Installation

Viviana Mall ,   Thane

Project size: 256 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Manufacturing
Commissioned on: 2017
CO2 Abated: 369 Tonnes
Trees saved: 6,096
View Photos

256 kWp, Metal Rooftop Installation

VULKAN India ,   Pune

Project size: 124 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Government
Commissioned on: 2016
CO2 Abated: 179 Tonnes
Trees saved: 2,953
View Photos

124 kWp, RCC Rooftop Installtion

Central Public Works Department ,   Belapur

Project size: 148 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Government
Commissioned on: 2016
CO2 Abated: 213 Tonnes
Trees saved: 3,524
View Photos

148 kWp, RCC Rooftop Installation

Central Public Works Department ,   Pune

Project size: 1,040 kWp
Roof type: Ground Mount
Module type: Polycrystalline
Inverter type: String
Industry type: Food & Beverage
Commissioned on: 2016
CO2 Abated: 1,498 Tonnes
Trees saved: 24,753
View Photos

1,040 kWp, Ground Mount Installation

Spirits Company ,   Nashik

Project size: 302 kWp
Roof type: Carport
Module type: Polycrystalline
Inverter type: String
Industry type: Auto & Auto ancillaries
Commissioned on: 2016
CO2 Abated: 432 Tonnes
Trees saved: 7,143
View Photos

302 kWp, Metal Rooftop Installation

Automobile Manufacturer ,   Igatpuri, Nashik

Project size: 45 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Pharmaceutical
Commissioned on: 2016
CO2 Abated: 65 Tonnes
Trees saved: 1,071
View Photos

45 kWp, RCC Rooftop Installation

Alkem Laboratories Ltd ,   Taloja

Project size: 3,200 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Auto & Auto ancillaries
Commissioned on: 2016
CO2 Abated: 4,608 Tonnes
Trees saved: 76,194
View Photos

3,200 kWp, Metal Rooftop Installation

Automobile Manufacturer ,   Pune

Project size: 731 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Engineering
Commissioned on: 2016
CO2 Abated: 1,053 Tonnes
Trees saved: 17,406
View Photos

731 kWp, Metal Rooftop Installation

Konecranes ,   Pune

Project size: 550 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: String
Industry type: Engineering
Commissioned on: 2015
CO2 Abated: 792 Tonnes
Trees saved: 13,096
View Photos

550 kWp, Metal Rooftop Installation

For a Industrial Solutions company ,   Chakan

Project size: 100 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Education
Commissioned on: 2015
CO2 Abated: 144 Tonnes
Trees saved: 2,381
View Photos

100 kWp, RCC Rooftop Installation

Agharkar Research Institute ,   Pune

Project size: 1,030 kWp
Roof type: Metal Rooftop
Module type: Polycrystalline
Inverter type: Central inverters
Industry type: Manufacturing
Commissioned on: 2015
CO2 Abated: 1,483 Tonnes
Trees saved: 24,525
View Photos

1,030 kWp, Metal Rooftop Installation

Glass Manufacturer ,   Taloja

Project size: 3,756 kWp
Roof type: Ground Mount
Module type: Polycrystalline
Inverter type: Central inverters
Industry type: IT/ITES
Commissioned on: 2015
CO2 Abated: 5,409 Tonnes
Trees saved: 89,433
View Photos

3,756 kWp, Ground Mount Installation

IT/ITES,   Pune

Project size: 700 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Education
Commissioned on: 2014
CO2 Abated: 1,008 Tonnes
Trees saved: 16,667
View Photos

700 kWp, RCC Rooftop Installation

Savitribai Phule Pune University ,   Pune

Project size: 100 kWp
Roof type: RCC Rooftop
Module type: Polycrystalline
Inverter type: String inverters
Industry type: Manufacturing
Commissioned on: 2013
CO2 Abated: 144 Tonnes
Trees saved: 2,381
View Photos

100 kWp, RCC Rooftop Installation

SKF India Ltd ,   Pune

Rooftop State Level Policy Data

State Pages on Website Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap Banking Norms for Rooftop Key Approvals required for Rooftop DISCOMs   Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.
Maharashtra 1 kW–1 MW Yearly 1. CEIG approval
2. The consumer and the DISCOM will enter into a Net Metering Connection Agreement, which shall remain in force for 20 years, in the prescribed format after the roof-top solar PV system is installed but before it is synchronized with the distribution network
The rooftop solar system installed on eligible consumer premises, are exempt from payment of banking and wheeling charges and losses, cross subsidy and additional surcharge etc. Project wise Statutory fees, testing fees, supervision charges, application fees etc. are applicable and varies time to time as policy changes
Uttar Pradesh 1 kW–2 MW Yearly 1. CEIG approval
2. No net metering
Rooftop solar PV system under gross metering scheme / net metering scheme, whether self-owned or third party owned and installed on eligible consumer premises are exempt from payment of wheeling and cross subsidy surcharge.
Rajasthan 1 kW–1 MW Yearly 1. CEIG approval
2. Any eligible consumer under the Rajasthan Net Metering Regulations may obtain approval for installation of rooftop solar system on its premises under net metering arrangement in accordance with the Rajasthan Net Metering Regulations and execution of an interconnection agreement for net metering with the distribution licensee.
Rooftop PV solar power plants under net metering arrangement are exempt from payment of wheeling, banking and cross subsidy surcharges.
Karnataka 1 kW–1 MW Monthly 1. CEIG approval (Applicable above 1MW)
2. Net metering approval (if applicable up to 1 MW)
Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity. In case it is a ground mount project then banking and wheeling charges may be applicable
Haryana NA–1 MW Yearly 1. CEIG approval
2. Net metering approval (if applicable) or a ‘no-objection certificate’ from the applicable local distribution utility.The consumer and the distribution utility will enter into a Net Metering Connection Agreement in the prescribed format after the roof-top solar PV system is installed but before it is synchronized with the distribution network.
While the Haryana Solar Policy has waived electricity taxes, electricity cess, electricity duty, and cross subsidy charges etc., but Transmission, wheeling and banking charges may be applicable as per the guidelines and orders issued by the HERC from time to time.
Tamil Nadu Consumers under Low Tension category except Hut and Agricultural category of tariff Yearly

1. CEIG approval
2. Net metering approval (if applicable) or NOC from Tangedco
3. Ministry clearance
4. Reverse test report (RTR) from local Tangedco

Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity.
Delhi 1 kW – NA* Yearly 1. CEIG approval
2. Net metering approval (if applicable) or NOC from DISCOM
In order to promote the third party owned systems and avoid complexities around evaluation and monitoring of wheeling/banking/open access charges, the net metering rooftop solar arrangements are specifically exempted from these charges
Telangana 1 kW–1 MW Half-yearly 1. CEIG Approval
2. The Net metering connection agreement has to be executed by the Consumer with the DISCOM within 15 days of receipt of the technical feasibility approval
3. On inspection of the equipment SPV system are to be synchronized within 10 working days, provided the systems are installed as per the norms and standards
1. Tariff payable by the DISCOM is the APCC of the DISCOM
2. Exempted from transmission charges, transmission loss, wheeling charge, wheeling loss, cross subsidy surcharge and additional surcharge
3. The CDM benefits shall be retained by the consumer for the first year and second year onwards, 10%, progressively increasing by 10% each year till the benefits are shared in equal proportion
Gujarat 1 kW–1 MW Yearly 1. CEIG approval
2. Net metering approval (OPEX project not allowed under net metering regulation. Only CAPEX projects considered for net metering) or NOC from DISCOM
Project wise Statutory fees, testing fees, supervision charges, application fees etc. are applicable and varies time to time as policy changes
Andhra Pradesh 1 kW–1 MW Quarterly 1. CEIG approval
2. Net metering approval (if applicable) or NOC from DISCOM
No Distribution losses and charges will be collected from the Eligible Developers /Group /Society /Individuals by the DISCOMs. All other charges shall be applicable as per the Tariff Order amended from time to time.
West Bengal 5 kW–not specified Yearly 1. CEIG approval
2. Net metering approval (if applicable) or NOC from DISCOM
Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity.
Puducherry NA–500 kWp; Yearly 1. CEA (Central electrical authority) approval
2. Net metering approval (if applicable)
Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. The consumer and the DISCOM will enter into a Net Metering Connection Agreement, which shall remain in force for 20 years, in the prescribed format after the roof-top solar PV system is installed but before it is synchronized with the distribution network

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

The rooftop solar system installed on eligible consumer premises, are exempt from payment of banking and wheeling charges and losses, cross subsidy and additional surcharge etc. Project wise Statutory fees, testing fees, supervision charges, application fees etc. are applicable and varies time to time as policy changes

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–2 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. No net metering

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Rooftop solar PV system under gross metering scheme / net metering scheme, whether self-owned or third party owned and installed on eligible consumer premises are exempt from payment of wheeling and cross subsidy surcharge.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Any eligible consumer under the Rajasthan Net Metering Regulations may obtain approval for installation of rooftop solar system on its premises under net metering arrangement in accordance with the Rajasthan Net Metering Regulations and execution of an interconnection agreement for net metering with the distribution licensee.

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Rooftop PV solar power plants under net metering arrangement are exempt from payment of wheeling, banking and cross subsidy surcharges.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval (Applicable above 1MW)
  2. Net metering approval (if applicable up to 1 MW)

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity. In case it is a ground mount project then banking and wheeling charges may be applicable

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

NA–1 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (if applicable) or a ‘no-objection certificate’ from the applicable local distribution utility.The consumer and the distribution utility will enter into a Net Metering Connection Agreement in the prescribed format after the roof-top solar PV system is installed but before it is synchronized with the distribution network.

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

While the Haryana Solar Policy has waived electricity taxes, electricity cess, electricity duty, and cross subsidy charges etc., but Transmission, wheeling and banking charges may be applicable as per the guidelines and orders issued by the HERC from time to time.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

Consumers under Low Tension category except Hut and Agricultural category of tariff

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (if applicable) or NOC from Tangedco
  3. Ministry clearance
  4. Reverse test report (RTR) from local Tangedco

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW – NA*

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (if applicable) or NOC from DISCOM

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

In order to promote the third party owned systems and avoid complexities around evaluation and monitoring of wheeling/banking/open access charges, the net metering rooftop solar arrangements are specifically exempted from these charges

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Half-yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. The Net metering connection agreement has to be executed by the Consumer with the DISCOM within 15 days of receipt of the technical feasibility approval
  3. On inspection of the equipment SPV system are to be synchronized within 10 working days, provided the systems are installed as per the norms and standards

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

  1. Tariff payable by the DISCOM is the APCC of the DISCOM
  2. Exempted from transmission charges, transmission loss, wheeling charge, wheeling loss, cross subsidy surcharge and additional surcharge
  3. The CDM benefits shall be retained by the consumer for the first year and second year onwards, 10%, progressively increasing by 10% each year till the benefits are shared in equal proportion

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (OPEX project not allowed under net metering regulation. Only CAPEX projects considered for net metering) or NOC from DISCOM

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Project wise Statutory fees, testing fees, supervision charges, application fees etc. are applicable and varies time to time as policy changes

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

1 kW–1 MW

Banking Norms for Rooftop

Quarterly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (if applicable) or NOC from DISCOM

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

No Distribution losses and charges will be collected from the Eligible Developers /Group /Society /Individuals by the DISCOMs. All other charges shall be applicable as per the Tariff Order amended from time to time.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

5 kW–not specified

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEIG approval
  2. Net metering approval (if applicable) or NOC from DISCOM

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity.

Eligibility Criteria for Net Metering i.e. Upper cap and Lower cap

NA–500 kWp;

Banking Norms for Rooftop

Yearly

Key Approvals required for Rooftop

  1. CEA (Central electrical authority) approval
  2. Net metering approval (if applicable)

Key Regulatory Charges/exemptions for Rooftop (if any) For more details visit individual DISCOM website.

Transmission and wheeling charges will not be applicable to rooftop solar projects to the extent there is no wheeling of such electricity



* Subject to
- feasibility of interconnection with grid
- available capacity of service line connection of consumer of premise
- the sanctioned load of consumer of the premise

Source: Centre for Energy Finance, Individual DISCOM websites

Disclaimer: The information presented above is for educational purposes only. All the data provided in the article above are approximate values derived from third party sources, research articles or on ground experience and CleanMax would take no responsibility or have any obligation over the correctness of data. The regulatory policies get updated from time to time and it is highly encouraged that you head over to individual DISCOM sites to refer the latest changes.


Acronyms Used:

NOC No Objection Certificate
HERC Haryana Electricity Regulatory Commission
APPC Average Power Purchase Cost
CEIG Chief Electrical Inspector to Government
CDM Clean Development Mechanism